We haven't walked thru the house for two weeks as of yesterday so we were really happy to see all of the progress they've made around the house.  All the cabinetry around the house is up and mostly installed.  Most of the trim around the windows and doors are done as well as some baseboards in the basement and the upstairs.  Some of the custom cabinetry is done, like the lockers in the mudroom and the built-ins around the fireplace but we're still waiting for the kitchen hood and island. With all the cabinets in though, it's much easier to get a feel of the amount of space we'll have left for other things.

We're still waiting a little on the weather so the trim around the windows can be painted white and I'm guessing they're also waiting for better temps for the stone on the outside too. 


It's looking like we're going to have too much storage for the things we've got.  I'm sure not a lot of people say that but I'm happy about it.  I'm sure as the years go by in this house we'll accumulate enough things to fill all the cabinets. We'll also need to think about a step stool because after standing next to the cabinets there is no way I'm going to be able to reach the top!


BUILDING TIMELINE:
Oct 8 (Day 1) - We signed our contract and everything is official!
Oct 9 (Day 2) - Expected ground breaking - delay with permit.
Oct 14 (Day 7) - Pick out front door (similar to this), interior doors, house molding, door knobs, and decking and siding.
Oct 15 (Day 8) - Fireplace picked
Oct 21 (Day 14) - Faucets, sinks, shower heads, toilets.  Also garage door.
Oct 23 (Day 16) - Cabinetry for the whole house - knobs and handles
Nov 5 (Day 29) - Ground breaking - hole digging and laying some foundation.
Nov 13 (Day 37) - Outside brick picked
Nov 18 (Day 42) - Cabinet place again - Changed our minds of the kitchen cabinets!
Nov 19 (Day 43) - Chose lighting, sort of because that was pretty hard. Still have to finalize some choices.
Week of Nov 24 (Day 53) - Pour concrete base - framing basement - finalize light choices and custom island color, custom hood vent and misc faucets.
Week of Dec 8 (Day 68) - Finishing up the framing and starting the roof. Plywood mostly put up all around the house. It's starting to look like a house.
Week of Dec 15 (Day 75) - Framing complete and ready for siding. Roof almost finished. Electrical walk-through, still deciding on lights.  Electrical rough-in and instal of fireplace. Tubs in bathrooms.
Week of Dec 22 (Day 82) - Inspections. Insulation and drywall will be up this week. Final interior finishes picks.
Week of Jan 5 (Day 96) - Siding, finishing drywall.
Week of Jan 19 (Day 110) - Cabinets being delivered, Trim going up
Week of Jan 26 (Day 117) - Cabinetry installed - Custom cabinetry made and installed - continue trim
Week of Feb 2 (Day 124) - Finish trim - start painting

3 comments:

  1. Oh wow, it's going to be gorgeous- and filled with such lovely light too!

    ReplyDelete
  2. This home looks like it will be lovely!

    ReplyDelete
  3. Congratulations on your beautiful home! I remember moving into our first 1100 sf home and it being so empty and how my husbands grandma was always getting rid of stuff. Now 34 years later and 2 remodels, my house is packed and I'm the one trying to get rid of stuff! LOL!

    ReplyDelete